2,Paint consumption:
Coating fluid consumption:0.15Kg/T;
Primer thickness:8um
Consumption is :21g/M2
Back paint thickness :10um
Consumption is:26g/M2
Thick paint :17
Consumption is:45g/M2.
3,Natural gas
Calorific value: 8500Kcal/Nm3
Maximum consumption:300Nm3/h
Working pressure:10-20KPa
Use system: Continuous
Operating temperature: Normal temperature
Normal production consumption:≤ 5Nm3/t(Consumption per ton of steel)
4,Steam: This line does not use steam.
5,Electricity
High pressure: 10kV/2.5%/ 5% Low pressure: 400 V
Frequency: 50 Hz
Transformer capacity:630KVA
Power consumption during normal production:50Kwh/t(Electricity consumption per ton of steel)
6,Staffing
The production workshop has three shifts and the management department has one shift. 8 hours of work per class, 24 hours of continuous operation.
7,Unit and plant and layout requirements
The unit is located in the workshop with a span of 18m, a rail surface elevation of +10.5m, and a workshop length of approximately 160m. The workshop has two spans, one of which is a raw material span and a final product span