• 80000tons/Y Painting Equipment Color Coating Line
  • 80000tons/Y Painting Equipment Color Coating Line
  • 80000tons/Y Painting Equipment Color Coating Line
  • 80000tons/Y Painting Equipment Color Coating Line
  • 80000tons/Y Painting Equipment Color Coating Line
  • 80000tons/Y Painting Equipment Color Coating Line

80000tons/Y Painting Equipment Color Coating Line

Warranty: 1y
Transmission Type: Automation
Automatic Production Line: Automation
Certification: ISO, CE
Automation: Automation
Flexible Production: Agile Manufacturing
Customization:
Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
ccl001
Rhythm
Flow Production Line
Production Scope
Product Line
After-sales Service
Yes
Energy
Sources Water, Electricity, Natur
Strip Thickness
0.2-2.5mm
Strip Width
500mm-1500mm (Max)
Transport Package
Standard Seaworthy Package
Specification
steel
Origin
China
HS Code
8479819000
Production Capacity
20 Sets/Year

Product Description

Color coating line energy media and consumption

1,Water quality requirements and technical characteristics

1)Desalination water: Quality: Conductivity:≤10us/cm PH:6.5-7
Hardness:≤0.03mmol/L Oil content:≤2mmol/L
Suspended matter:≤5mg/L
Qressure:0.5-0.6MPa Flow:3T/h
2)Recycled water: Quality: Hardness(Ca+Mg):≤16dh PH:6.0-8.7
Suspended matter:≤20mg/L
Qressure:0.4-0.5MPa Flow:50T/h
3)Degreasing section sewage discharge: Quality: Alkaline and oily wastewater PH:9.0-13
Qressure:0.4MPa Qressure:2T/d
Emissions system: interval emissions, about 5T/time, 1 time/3 days
80000tons/Y Painting Equipment Color Coating Line80000tons/Y Painting Equipment Color Coating Line80000tons/Y Painting Equipment Color Coating Line
2,Paint consumption:
Coating fluid consumption:0.15Kg/T;
Primer thickness:8um
Consumption is :21g/M2
Back paint thickness :10um
Consumption is:26g/M2
Thick paint :17
Consumption is:45g/M2.
80000tons/Y Painting Equipment Color Coating Line80000tons/Y Painting Equipment Color Coating Line80000tons/Y Painting Equipment Color Coating Line80000tons/Y Painting Equipment Color Coating Line80000tons/Y Painting Equipment Color Coating Line
3,Natural gas

Calorific value: 8500Kcal/Nm3
Maximum consumption:300Nm3/h
Working pressure:10-20KPa
Use system: Continuous
Operating temperature: Normal temperature
Normal production consumption:≤ 5Nm3/t(Consumption per ton of steel)

4,Steam: This line does not use steam.
80000tons/Y Painting Equipment Color Coating Line

5,Electricity


High pressure: 10kV/2.5%/ 5% Low pressure: 400 V
Frequency: 50 Hz
Transformer capacity:630KVA
Power consumption during normal production:50Kwh/t(Electricity consumption per ton of steel)
80000tons/Y Painting Equipment Color Coating Line
6,Staffing

The production workshop has three shifts and the management department has one shift. 8 hours of work per class, 24 hours of continuous operation.

7,Unit and plant and layout requirements

The unit is located in the workshop with a span of 18m, a rail surface elevation of +10.5m, and a workshop length of approximately 160m. The workshop has two spans, one of which is a raw material span and a final product span

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now